A new look for a familiar building
This project combines the renovation of a mid-rise building with deep reveal frames of varying dimensions. A total of 60 aluminium reveal frames were installed in Ciney, manufactured by Ursus using the Roundal Bolted system.
Reveal frame specialists
For the renovation of the Public Centre for Social Welfare (CPAS) in Ciney, Arobase (AA) was looking for a partner capable of handling complex window detailing.
Pierret Project was selected to install and finish the Roundal reveal frames manufactured by Ursus. Pierret Project is Pierret's specialist project division, providing comprehensive solutions for residential, commercial and public construction projects.
Thanks to their experience in the technical development and installation of aluminium reveal frames, they were able to approach this challenging renovation project with confidence.
Bolted rather than welded: a deliberate choice
For this project, a bolted Roundal solution was selected. This decision made sense from both a technical and a budgetary perspective.
Welded reveal frames with a depth of almost 800 mm are:
- More complex to coat.
- Impractical to transport: they take up considerable space in a lorry, limiting the number of frames that can be carried.
The bolted design allows the frames to be packed and transported more compactly, reducing transport costs.
On site, this choice translates into a straightforward, logical installation process for Pierret Project:
- The reveal frames can be assembled and secured using a repeatable process.
- A low risk of errors and a clearly defined installation sequence.
For a project involving 60 frames, these are not minor details, but decisive factors in ensuring speed and reliability.
Reveal frames first, render second
Renovation often involves working with existing structures that are not perfectly aligned or dimensionally consistent. This project in Ciney was no exception, but the façade build-up offered an advantage.
The reveal frames were installed first, after which the surrounding façade was finished with render.
Concealed folds, visible stability
The challenge lay in the exceptional depth of the reveal frames, reaching up to 790 mm. At such depths, the structural stability of the reveal frames is crucial.
Our designers incorporated strategically positioned folds into the front section of the reveal profile. These folds are positioned close together, making them barely noticeable while providing additional stability across the full depth of the frame.